NEPA Number: DOI-BLM-CO-G020-2022-0001-RMP-EIS
Project Name: Colorado River Valley Field Office and Grand Junction Field Office Supplemental EIS

Maps

Records of Decision and Approved RMPs

Please refer to the Records of Decision/Approved RMPs for maps (available on the Documents tab to the left). The Approved RMPs contain detailed maps for implementation (similar to the maps for Alternative G in the Final Supplemental EIS). 


Proposed RMPs/Final Supplemental EIS

Please refer to the Proposed RMPs/Final Supplemental EIS for maps (available on the Documents tab to the left).

Appendix I (Volume 2) includes detailed maps of the Proposed RMP management in Alternative G. Other maps can be found in Volume 1 (main body of the Proposed RMP/Final Supplemental EIS) - see list of figures in the Table of Contents. There are also maps in Appendix G (Volume 2) and Appendix J (Volume 3).