Project Name: Jove Solar Project

NEPA Number: DOI-BLM-AZ-C020-2022-0006-EIS

Documents

Documents available below: 

  • Notice of Proposed Decision on the Clem Allotment Grazing Permit Modification (April 14, 2025)
  • Notice of Proposed Decision on the K Lazy B Allotment Grazing Permit Modification (June 11, 2025)
  • Record of Decision approving the Wash Avoidance Alternative, signed January 3, 2025.
  • Final Environmental Impact Statement published November 15, 2024
  • Plan of Development and RDEP (Restoration Design Energy Project)-required Plans and Reports. These documents authored by the Applicant's team.
  • Draft Environmental Impact Statement (EIS) published April 19, 2024.
  • Plans and Reports. These documents authored by the Applicant's team. Please contact the BLM if accessibility is needed.
  • Slides from the May 14, 2024 Draft EIS virtual public meeting.
  • Biological Resource Technical Report under "Plan of Development and RDEP-required Plans and Reports" category (5/21/2024)
  • Scoping Report and materials from the public scoping meetings.
     
  • Federal Register Notice announcing start of formal scoping (12/7/2022).
  • Variance Factor Analysis and Approval (12/7/2021).  

Please visit "Related Projects & Links" to see related programmatic solar projects that provide guidance for solar projects developed on BLM-managed land, and the link to the recording of the Jove Solar Virtual Public Meeting held on January 17, 2023, and the Draft EIS virtual public meeting (May 14, 2024). 
 

 

Documents are located within categories. Please click on the category to expand it and view the associated documents.