Documents
The BLM has
issued a new Record of Decision (ROD) for the National Petroleum Reserve in Alaska
(NPR-A) Integrated Activity Plan (IAP). This decision is based on the NEPA
analysis as presented in the 2020 IAP Final Environmental Impact Statement and the 2025 IAP environmental assessment (EA) that
incorporates new information that has arisen since the publication of the 2020
IAP/EIS. The 2025 IAP ROD, final 2025 IAP EA, and Finding of No New Significant
Impacts (FONNSI) are available below along with the draft 2025 IAP EA which was
made available for public comment in summer 2025.
The BLM has also made available
copies of the final Biological Opinions from the U.S. Fish and Wildlife Service
and NOAA-Fisheries prepared in compliance with Section 7 of the Endangered
Species Act for the Proposed Action.
