2.3.13.3. Management Actions

VR-6. Project proposals that could result in surface disturbance or may contain visible components will be analyzed using procedures outlined in BLM Handbook H-8431-1, Visual Contrast Rating, to determine their conformance with the VRM allocation of the project area. If necessary, modifications will be made to the project, including design changes or a change of location, for the project to meet the VRM Class objective. In any case, regardless of VRM Class, an effort will be made to make any project proposal with a visible component as visually compatible with its surroundings as practical.

VR-7. If possible, avoid utilizing strobes or other lights that will affect the quality of night skies.