2.3.5.2.2. Utility and Transportation Corridors

LR-15. All major utilities will be routed through designated corridors. Encourage new rights-of-way within designated corridors to promote the maximum use of existing routes. Encourage joint use whenever possible.

LR-16. Co-locate smaller utility lines needed for local service near corridors or within a corridor unless doing so would limit the opportunity to co-locate other major utility lines in the corridor.

LR-17. Whenever possible, promote energy transfer efficiency and support alternative energy sources, such as the use of photovoltaic cells (solar energy) and wind power.

LR-18. Whenever possible, design or route utility transmission lines to minimize adverse visual impacts to the surrounding lands and vistas.

LR-19. In the Wickenburg Bypass and Canamex transportation corridors, other uses will be allowed when these uses are compatible, unless doing so would negatively impact the corridors.