U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-UT-0300-2017-0066-EA (Hole in the Rock Road Repair)  
> NEPA Register > DOI-BLM-UT-0300-2017-0066-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-UT-0300-2017-0066-EA Status:  Preparation and Planning
Project Name:  Hole in the Rock Road Repair Decision Date: 
EIS OEPC #:  FONSI Date: 
Applicant:  Garfield County    
Case File Number/:
Project Number 
   
Start Date:  08/29/2017    
End Date:     
 
Project Description:
The Bureau of Land Management (BLM), Grand Staircase-Escalante National Monument (GSENM) is soliciting input on the Hole-in-the-Rock Road Repair Project for Garfield County, UT. Garfield County is proposing to repair deteriorating conditions of the road such as, erosion, down cutting, and flooding at ephemeral washes. Repairing the road would enable effective long-term maintenance of Hole-in the-Rock Road (HITRR) and protect GSENM resources found along the road. Repairs are proposed for the 16 mile section of HITRR within Garfield County, UT (see Project and Analysis Area Map). The project analysis area begins 5.0 miles southeast of Escalante and includes the entire length of the HITRR (57 miles), which terminates at Lake Powell in Glen Canyon National Recreation Area within Kane County, UT.
Project Location:
Hole in the Rock Road, within Garfield County
 
Project Lead:  Amber Hughes    
Phone Number:  (435) 826-5602    
Email Address:  ahughes@blm.gov    
Office(s):  Grand Staircase-Escalante NMON Lead Office:  Grand Staircase-Escalante NMON
Counties:  Kane
Garfield
   
 
Program(s):  Recreation and Visitor Services Subprogram(s):  Trails and Travel Management
Cooperating Agencies:     
 

Documents: 
Document Name Release Date Available Formats Public Participation
Garfield_HITR_map 09/27/2017 Garfield_HITR_map.pdf (615 KB) 
Scoping Letter 09/27/2017 Scoping Letter.pdf (108 KB) 
30 percent design typical sections 10/02/2017 30 percent design typical sections.pdf (170 KB) 
2017 FAQ FINAL_508 11/03/2017 2017 FAQ FINAL_508.pdf (1197 KB) 
 
Public Meeting Materials
Document Name Release Date Available Formats Public Participation
Background Board 11/03/2017 Background Board.pdf (2548 KB) 
Environmental Resources Board 11/03/2017 Environmental Resources Board.pdf (1271 KB) 
Maintenance Board 11/03/2017 Maintenance Board.pdf (349 KB) 
Management Zones Board 11/03/2017 Management Zones Board.pdf (1586 KB) 
Project Corridor Board 11/03/2017 Project Corridor Board.pdf (2001 KB) 
Road Design Rendering Board 11/03/2017 Road Design Rendering Board.pdf (6213 KB) 
Schedule and EA and Comment Process Board 11/03/2017 Schedule and EA and Comment Process Board.pdf (122 KB) 
Special Recreation Management Areas Board 11/03/2017 Special Recreation Management Areas Board.pdf (1963 KB) 
Typical Cross Section Board 11/03/2017 Typical Cross Section Board.pdf (298 KB) 
Welcome Board 11/03/2017 Welcome Board.pdf (4482 KB) 
Wilderness Study Areas Board 11/03/2017 Wilderness Study Areas Board.pdf (1852 KB) 
 

Last Updated:  11/27/2017 11:12:05 MST