U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-NV-S010-2013-0024-EA (Lima Nevada Gypsum Quarry Plan of Operations)  
> NEPA Register > DOI-BLM-NV-S010-2013-0024-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-NV-S010-2013-0024-EA Status:  Completed
Project Name:  Lima Nevada Gypsum Quarry Plan of Operations Decision Date:  05/16/2018
EIS OEPC #:  FONSI Date: 
Applicant:  Lima Nevada Gypsum Quarry    
Case File Number/:
Project Number 
N-91107    
Start Date:     
End Date:  05/16/2018    
 
Project Description:
Lima Nevada Gypsum Quarry submitted a three-phased 35 year Plan of Operations (Pla) for their existing operations in the withdrawn Rainbow Gardens ACEC. A validity examination of the mining claims has shown a valid economically developable gypsum deposit. Pioneer's Plan covers 155 acres of disturbance.
Project Location:
In the Rainbow Gardens ACEC, south of Pabco Gypsum patent in Sections 19, 20, 29, and 30, T. 20 S., R. 64 E., M.D.M.
 
Project Lead:  Lorri Dukes    
Phone Number:  702-515-5282    
Email Address:  Lorri_Dukes@blm.gov    
Office(s):  Las Vegas FO Lead Office:  Las Vegas FO
Counties:  Clark    
 
Program(s):  Mining Subprogram(s):  None
Cooperating Agencies:     
 

Documents: 
Document Name Release Date Available Formats Public Comment Period
Environmental Assessment (draft) 01/17/2018  (2 Files)
Plan of Operation 2017 01/24/2018 Lima Nevada Gypsum Mining Plan of Operations 112117 (1).PDF (13311 KB) 
 
Document Name Release Date Available Formats Public Comment Period
Signed DOI-BLM-NV-S010-2013-0024-EA 05/16/2018  (3 Files)
 

Last Updated:  05/16/2018 16:43:02 MDT