ePlanning DOI-BLM-NV-S010-2010-0149-EA (N-88313 (Apex Solar Power - 69 kV Gen-Tie Transmission Line Project))  
> NEPA Register > DOI-BLM-NV-S010-2010-0149-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-NV-S010-2010-0149-EA Status:  Completed
Project Name:  N-88313 (Apex Solar Power - 69 kV Gen-Tie Transmission Line Project) Decision Date:  08/25/2010
EIS OEPC #:  FONSI Date:  08/25/2010
Applicant:  Fotowatio Nevada Solar, LLC    
Case File Number/:
Project Number 
Start Date:  07/22/2010    
End Date:  08/25/2010    
Project Description:
Fotowatio Nevada Solar, LLC (Fotowatio) proposes to construct a new 69 kilovolt (kV) transmission line connecting their proposed Apex Solar Power Project substation to an existing 69kV transmission line owned by NV Energy. The Apex Solar Power Project is a proposed 20 MWac (24.9 MWdc) photovoltaic solar power facility located entirely on private land within the Apex Industrial Park in the City of North Las Vegas, Nevada. The proposed transmission line would tie into a new substation to be located on private land in the Apex Industrial Park; cross approximately 1,200 feet of public land administered by the BLM Southern Nevada District, Las Vegas Field Office; then tap into the NV Energy transmission line, within an existing utility corridor.
Project Location:
Township 18 South, Range 63 East, Section 17, Lots 3, 4, 6 and 8.
Project Lead:  Brenda Wilhight    
Phone Number:  702-515-5172    
Email Address:     
Office(s):  Las Vegas FO Lead Office:  Las Vegas FO
Counties:  Clark    
Program(s):  Other Subprogram(s):  None
Cooperating Agencies:     

  Document Name Release Date Available Formats Public Comment Period
Final EA - Fotowatio 07/22/2010 Final EA - Fotowatio  (2 KB) 

  Document Name Release Date Available Formats Public Comment Period
Documentation 3.pdf 07/22/2010 Documentation 3.pdf