U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-UT-Y020-2016-0001-EA (Daneros Mine Plan Modification)  
> NEPA Register > DOI-BLM-UT-Y020-2016-0001-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-UT-Y020-2016-0001-EA Status:  Decision and Appeal
Project Name:  Daneros Mine Plan Modification Decision Date:  02/23/2018
EIS OEPC #:  FONSI Date:  02/23/2018
Applicant:  Energy Fuels Resources (USA) Inc.    
Case File Number/:
Project Number 
UTU-74631    
Start Date:  10/07/2015    
End Date:     
 
Project Description:
Energy Fuels is proposing to modify its Daneros Mine Plan of Operations. The proposed modification would expand facilities at the Daneros Portal Area; add new facilities at two historic mine sites (the Bullseye and South Portal Areas); and construct additional vent holes and associated access roads to support future mining. The proposed facilities include the folowing: rehabilitation of the existing Bullseye Portal; Construction of the South Portal; expansion of the development rock area (DRA) at the Daneros Portal Area; construction of DRAs at the Bullseye and South Portal Areas; construction of ore stockpile areas at the Bullseye and South Portal Areas; construction of topsoil and inert material stockpile areas; installation of drainage control structures; installation of mine infrastructure systems; installation of office/shop complex at the South Portal Area; and installation of up to 8 additional ventilation holes. Operation and maintenance of these facilities would occur throughout the life of mine (20 years). The facilities would be constructed in a phased manner with mine operations resuming at the Daneros Portal and construction starting at the Bullseye Portal. As mining progresses, the South Portal Area would be developed while much of the the Daneros and Bullseye Portal Areas would be reclaimed, including the DRAs. All disturbed areas would be reclaimed at the conclusion of mining operations. Total ore production for life of mine would increase from 100,000 tons over 7 years to 500,000 tons over 20 years. Total mine disturbance would increase from 4.5 acres to 46 acres.
Project Location:
The Daneros Mine is located in Bullseye Canyon, in the central portion of the Colorado Plateau in southeast Utah. The mine is remotely located approximately 67 miles west of Blanding, Utah in T. 37 S., R. 16 E., Sections 5, 6, 7, 8, 17 and 18, San Juan County.
 
Project Lead:     
Phone Number:  (435) 587-1512    
Email Address:  tmcdouga@blm.gov    
Office(s):  Monticello FO Lead Office:  Monticello FO
Counties:  San Juan    
 
Program(s):  Mining Subprogram(s):  Hard Rock (gold, silver, copper, uranium, etc.)
Cooperating Agencies:     
 

Documents: 
Document Name Release Date Available Formats Public Participation
Decision Record 02/23/2018 Daneros Decision Record (2).pdf (805 KB) 
Finding of No Significant Impact 02/23/2018 Daneros FONSI (2).pdf (226 KB) 
Environmental Assessment (EA) 10/04/2017 Final_EA_with Appendices_09.2017.pdf (25567 KB) 
MPOM 10/04/2017 MPOM_10.04.2017.pdf (1131 KB) 
MPOM_Figures 10/04/2017 MPOM_figures_all.zip (29193 KB) 
MPOM_Attachments 10/04/2017 MPOM_attachments_all.zip (82349 KB) 
Preliminary EA Previously Available for Public Review 05/10/2016  (8 Files)
 

Last Updated:  02/04/2019 10:06:45 MST