NEPA #: |
DOI-BLM-NV-S010-2010-0060-DNA |
Status: |
Completed |
Project Name: |
2010-060 SWG Pipeline located East of C/L of Tenaya Way |
Decision Date: |
03/19/2010 |
EIS OEPC #: |
|
FONSI Date: |
|
Applicant: |
Southwest Gas Corporation |
|
|
Case File Number/: Project Number |
N-87798 |
|
|
Start Date: |
|
|
|
End Date: |
03/19/2010 |
|
|
|
Project Description:
Southwest gas has reqeusted a 2 inch gas pipeline along LeBaron to allow for the construction of improvements as presently planned, and will contribute to these needs and connect with existing gas line system. All materials on-site will n ot be exported off-site. The length of the requested right-of-way is 338.5 feet with a width of 20 feet representing.16 total acres. The area iis completely disturbed and was reviewed under case N-63015 with an Administrative Decision number NV-056-99-62 referencing the Programmatic EA NV-054-96-117 dated October 18, 1996. |
Project Location:
T.22S., R.60E., MDM, sec. 27, E2SENENW |
|
Project Lead: |
Cheryl G. Cote |
|
|
Phone Number: |
702-515-5000 |
|
|
Email Address: |
|
|
|
Office(s): |
Las Vegas FO
|
Lead Office: |
Las Vegas FO |
Counties: |
Clark
|
|
|
|
Program(s): |
Other
|
Subprogram(s): |
None
|
Cooperating Agencies: |
|
|
|
|