U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-CO-F020-2019-0078-EA (Fremont to Tunnel Drive Trail Canon City)  
> NEPA Register > DOI-BLM-CO-F020-2019-0078-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-CO-F020-2019-0078-EA Status:  Comment and Review Period
Project Name:  Fremont to Tunnel Drive Trail Canon City Decision Date: 
EIS OEPC #:  FONSI Date: 
Applicant:  City of Canon City, BLM    
Case File Number/:
Project Number 
   
Start Date:  09/20/2019    
End Date:     
 
Project Description:
The BLM is preparing an Environmental Assessment (EA) to analyze the impacts of designating and constructing a non-motorized trail connection between two existing trail systems in Cañon City, Colorado. This trail is proposed by the City of Cañon City to connect Tunnel Drive Trail and the Riverwalk trails to the Royal Gorge Park Trail System near the communication towers on Fremont Peak.
Project Location:
Canon City, Colorado
 
Project Lead:  Linda Skinner    
Phone Number:  (719) 269-8732    
Email Address:  lskinner@blm.gov    
Office(s):  Royal Gorge FO Lead Office:  Royal Gorge FO
Counties:  Fremont    
 
Program(s):  Recreation and Visitor Services Subprogram(s):  Trails and Travel Management
Cooperating Agencies:     
 

Documents: 
Document Name Release Date Available Formats Public Participation
Fremont to Tunnel Drive Trail Canon City DRAFT EA 10/25/2019 DRAFT_DOI-BLM-CO-F020-2019-0078 EA.pdf (1691 KB)   
2019-0078-EA maps 09/20/2019  (2 Files)  
 

Last Updated:  10/25/2019 17:01:07 MDT