ePlanning DOI-BLM-MT-C030-2018-0083-EA (Little Missouri River Bridge and Other Unauthorized Developments)  
> NEPA Register > DOI-BLM-MT-C030-2018-0083-EA
NEPA Project Summary 
NEPA #:  DOI-BLM-MT-C030-2018-0083-EA Status:  Comment and Review Period
Project Name:  Little Missouri River Bridge and Other Unauthorized Developments Decision Date: 
EIS OEPC #:  FONSI Date: 
Applicant:  Wylie Bice    
Case File Number/:
Project Number 
NDM 109750, NDM 109751, NDM 109752, NDM 109862    
Start Date:  07/10/2018    
End Date:     
 
Project Description:
The BLM has prepared an environmental assessment (EA) to analyze the potential impacts of whether or not to grant a right-of-way for an existing 300-foot, three-span, single-lane, pre-fabricated steel ranch bridge over the Little Missouri River, with a 1,000-foot long unpaved access road, that is partially situated on BLM-managed public land in Dunn County, North Dakota. In addition, the EA analyzes the potential impacts to removing and reclaiming an unauthorized water settlement pond and portions of two alfalfa fields that are situated on BLM land. In all, nearly 13 acres of public land are affected.
Project Location:
Lots 3, 6, and 13, Section 33, T. 148 N., R. 97 W., Fifth Principal Meridian, Dunn County, North Dakota
 
Project Lead:     
Phone Number:     
Email Address:     
Office(s):  North Dakota FO Lead Office:  North Dakota FO
Counties:  Dunn    
 
Program(s):  Lands and Realty Subprogram(s):  Rights-of-Way
Cooperating Agencies:     
 

Documents: 
Document Name Release Date Available Formats Public Participation
Little Missouri River Bridge Public Scoping Letter 07/10/2018 Little Missouri River Bridge Public Scoping Letter.pdf (363 KB) 
 
Document Name Release Date Available Formats Public Participation
EA 03/25/2019 EA.pdf (415 KB) 
Draft FONSI 03/25/2019 Draft FONSI.pdf (64 KB) 
Location Map 03/25/2019 Little Missouri River Bridge Location Map.pdf (1527 KB) 
 
Document Name Release Date Available Formats Public Participation
Public Scoping Comments 05/15/2019 Comments have been temporarily removed until further notice.pdf (33 KB) 
Environmental Assessment Comments 05/15/2019 Comments have been temporarily removed until further notice.pdf (33 KB) 
 

Last Updated:  05/21/2019 11:45:26 MDT