Decision
The Record of Decision is now available.  To review the Decision, click on "Documents" on the left side of this page.  

The shortened url for this project's website is: http://go.usa.gov/csa9j
 
 
 
Project Description:
Under the ROD, Enefit American Oil may construct 13.7 miles of water supply pipeline, 5.58 miles of buried natural gas supply pipeline, 7.18 miles of buried oil product line, two138-kilovolt H-frame power lines, and upgrade an estimated five miles of the Dragon Road on public lands in the Vernal Field Office.  The project would provide access, natural gas, electricity, and water to—while allowing for the movement of processed oil from—Enefit American Oil’s South Project, which is planned on private land and minerals owned by Enefit.  The corridor project is located approximately 40 miles south of Vernal, Utah.
Project Location:
Townships 8-10 South, Ranges 24-25 East

The Enefit American Oil Utility Corridor Project would provide access, natural gas, electricity, and water to, and move processed oil from, Enefit American Oil’s private land.