Home 
Public Comment Period
A 45-day waiting period for the Enefit Final EIS is being held May 18 through July 9, 2018.  To review the EIS, click on "Documents" on the left side of this page.  

The shortened url for this project's website is: http://go.usa.gov/csa9j
 
 
 
Project Description:
Under the proposal, Enefit American Oil would construct 19 miles of water supply pipeline, 8 miles of natural gas supply pipeline, 10 miles of oil product line, 29 miles of single or dual overhead 138-kilovolt H-frame powerlines, and upgrade an estimated five miles of Dragon Road on BLM-administered lands in the Vernal Field Office.
Project Location:
Townships 8-10 South, Ranges 24-25 East


If approved, the Enefit American Oil Utility Corridor Project would provide access, natural gas, electricity, and water to, and move processed oil from, Enefit American Oil’s “South Project,” which is planned on private land and minerals owned by Enefit. The South Project is a private project (private land and private minerals) that would be regulated by the Utah Division of Oil, Gas and Mining.  It includes development of a commercial oil shale mining, retorting, and upgrading operation located in Uintah County, Utah.  The BLM has no jursidiction over the South Project.