U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-UT-G010-2014-0007-EIS (Enefit American Oil Utility Corridor Project EIS)  
> NEPA Register > DOI-BLM-UT-G010-2014-0007-EIS > Home
  
Find Whole Words Only
Home
Documents
Contact Information
How to get Involved
    Meetings
Maps
    Data
Links
FAQs
Last Updated:
06/20/2016 13:13:59 MDT
Home 
Public Comment Period
A 60-day public comment period for the Draft EIS was held from April 8, 2016 through June 14, 2016.  To review the EIS or its official press release, click on "Documents" on the left side of this page.  Comments received during the comment period are being reviewed and compiled for response prior to publication of a Final EIS.

The shortened url for this project's website is: http://go.usa.gov/csa9j
 
 
 
Project Description:
Under the proposal, Enefit American Oil would construct 19 miles of water supply pipeline, 8 miles of natural gas supply pipeline, 10 miles of oil product line, 29 miles of single or dual overhead 138-kilovolt H-frame powerlines, and upgrade an estimated five miles of Dragon Road on BLM-administered lands in the Vernal Field Office. If approved, the project, referred to as the Enefit American Oil Utility Corridor Project, would provide access, natural gas, electricity, and water to, and move processed oil from, Enefit American Oil’s “South Project,” which is planned on private land and minerals owned by Enefit. The Enefit American Oil’s planned South Project is a non-Federal connected action which will include development of a commercial oil shale mining, retorting, and upgrading operation located in Uintah County, Utah.
Project Location:
Townships 8-10 South, Ranges 24-25 East