U.S. DEPARTMENT OF THE INTERIOR  BUREAU OF LAND MANAGEMENT  
ePlanning DOI-BLM-CO-N040-2019-0086-CX (5 Proposed Water Monitoring Wells)  
> NEPA Register > DOI-BLM-CO-N040-2019-0086-CX > Documents
  
Find Whole Words Only
Home
Documents
Contact Information
How to get Involved
    Meetings
Maps
    Data
Links
FAQs
Last Updated:
09/25/2019 08:17:10 MDT
Documents 
Below is the proposed action and project map for the 5 proposed monitoring wells and the Request for Authorization submitted by the proponent. 
The Scoping Period is for the proposal to drill 5 monitoring wells. A copy of the detailed technical hydrologic baseline study plan will be made available on request.  

BLM Colorado will accept scoping comments through our ePlanning site beginning September 25, 2019. 
The Scoping Period will close on October 24, 2019. 

Comments received after that time or by other methods will not be accepted.
 
To submit a comment please click on the Comment on Document button to the right of the specific document.
Helpful tips when submitting comments:
You have a 60 minute window from start to finish to complete your submission, after that the system will time out
Do not put special characters in email address other than "@"
No special characters in the Comment Title
Use a complete 10 digit phone number
Attachments have a file size limit of 20MGB - you may submit multiple comments to accommodate larger attachments
If you are having trouble submitting comments, it may be due to your bandwidth being too slow
Do not leave submitting your comment to the last minute - start early
 
 
 
Scoping Period
Document Name Release Date Available Formats Public Participation
Proposed Action and Map 09/24/2019 Proposed Action for Hydro Study_Sept_2019.pdf (524 KB)     
Request for Authorization 09/24/2019 RMR Hydrologic Baseline Study Request Authorization.pdf (234 KB)