Project Name: Desert Sunlight Solar Farm
NEPA Number: DOI-BLM-CA-D060-2010-0002-EIS
Project Information
NEPA Number
DOI-BLM-CA-D060-2010-0002-EIS
Project Name
Desert Sunlight Solar Farm
Project Type
EIS
NEPA Status
Completed - Completed
Lead Office
Palm Springs and S Coast Field Office
Last Updated
What's New
Project Vitals
First Solar Development, Inc. (First Solar) has constructed a 550-megawatt (MW) solar photovoltaic (PV) power plant project known as the Desert Sunlight Solar Farm (DSSF or Project). The DSSF includes three main components 1) the Solar Farm site, 2) a transmission line, and 3) a Southern California Edison (SCE) owned and operated substation, Red Bluff Substation.
The Solar Farm site is on land administered by the Bureau of Land Management (BLM) six miles north of the rural community of Desert Center, which is adjacent to the I-10 freeway in eastern Riverside County, California.
The Project includes a 230-kV transmission line that would extend south from the Solar Farm site and interconnect to the planned Red Bluff substation near I-10. The Red Bluff Substation interconnects with the existing SCE Devers-Palo Verde 1 transmission line. The three main project components will require a total of about 4,410 acres – 4,090 acres for the Solar Farm, 230 acres for the transmission corridor, and 90 acres for the substation. For more information please contact the Bureau of Land Management Project Manager Frank McMenimen at (760) 833-7150 ([email protected] ).
Bureau of Land Management
Palm Springs - South Coast Field Office
1201 Bird Center Drive
Palm Springs, California 92262
Phone: (760) 833-7100
Fax: (760) 833-7199
Office Hours: 8:00 a.m. - 4:00 p.m., M-F
Draft EIS Publication
Final EIS Publication
Project Location
Application Information
CACA 48649
Renewable Energy
Solar Energy
Project Dates
Notice of Intent Publication
Record of Decision Publication
Project Office Information
Contacts