NEPA Number: DOI-BLM-WY-0000-2010-0001-EIS
Project Name: TransWest Express Transmission Line Project

Project Information 

  • NEPA Number
    DOI-BLM-WY-0000-2010-0001-EIS
  • Project Name
    TransWest Express Transmission Line Project
  • Project Type
    EIS
  • NEPA Status
    Completed - Completed
  • Lead Office
  • Last Updated


Project Description

What's New

The Record of Decision (ROD) was signed on December 13, 2016, and is now publicly available.  The ROD can be accessed through the Documents tab on the left-hand column of this page.  The most current GIS data can be accessed through the Data tab.
The Bureau of Land Management and the Western Area Power Administration are co-lead agencies in preparing an environmental impact statement under the National Environmental Policy Act for the TransWest Express Transmission Project. Western plans to partially fund the project under the American Recovery and Reinvestment Act of 2009.

The TransWest Express Transmission Project would provide transmission infrastructure and capacity to deliver approximately 3,000 megawatts of electric power from renewable and other energy resources in south-central Wyoming to a substation hub in southern Nevada. The proposed project would consist of an approximately 730-mile-long, 600-kilovolt, direct current transmission line, a northern terminal located near Sinclair, Wyoming, and a southern terminal approximately 25 miles south of Las Vegas, Nevada. A ground electrode system (required for transmission line emergency shutdown) would be installed within 100 miles of each terminal.

The proposed transmission line would cross Wyoming, Colorado, Utah, and Nevada, and encompass lands owned or administered by the BLM, U.S. Forest Service, National Park Service, Bureau of Reclamation, Utah Reclamation Mitigation and Conservation Commission, various state agencies, Native American tribes, municipalities, and private parties. The BLM and Western have included the government entities as cooperating agencies throughout this EIS process.

Final Environmental Impact Statement

The Final EIS responds to comments received on the Draft EIS and agency-preferred alternative by making clarifications and adjusting some routes. The Final EIS also includes amendments of Forest Service Land and Resource Management Plans and BLM land use plans. The BLM and the Forest Service have integrated the land use planning process with the NEPA analysis process for this project.

For more information, please see the Proponent's website at: www.transwestexpress.net/

                        Contact: Sharon Knowlton, Project Manager
         Phone: 307-775-6124 • Email: [email protected]
Mail: TransWest Express Project • PO Box 20678 • Cheyenne, WY 82003

Draft EIS Publication

  • Initial Scheduled Date
  • Revised Target Date
  • Actual Date
    7/3/2013


Final EIS Publication

  • Initial Scheduled Date
  • Revised Target Date
  • Actual Date
    5/1/2015


Project Location

City State/Territory Zip Code County(ies)
Nephi Utah 84648

Application Information

Project Dates

  • Start Date
    1/4/2011
  • End Date
    12/12/2016
  • FONSI Date


Notice of Intent Publication

  • Initial Scheduled Date
    1/4/2011
  • Revised Target Date
    1/4/2011
  • Actual Date
    1/4/2011


Record of Decision Publication

  • Initial Scheduled Date
  • Revised Target Date
  • Actual Date
    12/12/2016