NEPA Number: DOI-BLM-CO-N040-2018-0033-EA
Project Name: Balzac Gulch MDP - Phase 2

Maps

Project Synopsis
See the Home tab on this site for a project synopsis.  The Project Location Map was previously added to this site.  On January 9, 2018, a Dear Public Letter and detailed Proposed Action were added, and a 30-day public scoping period was established.  On the same date, the project was noticed in the Glenwood Springs Post Independent newspaper.