This DNA will re-evaluate the existing NEPA analysis for the 2023 Campbell Creek Science Center Access Improvement Project Environmental Analysis (EA) to reconsider implementation of Alternative 2, the 55-vehicle south alternative. The purpose of the project remains the same, to increase parking capacity and enhance visitor safety and orientation through the construction of a new parking lot, orientation signage, pedestrian walkways, and emergency vehicle access near the CCSC building on the CCSC campus.
Original 2023 EA document LINK - https://eplanning.blm.gov/Project-Home/?id=20c379d0-a7f2-f011-8407-001dd80bcf93
2022-2023 Project: DOI-BLM-AK-A010-2022-0005-EA